OpenSat Mission Control

v1.1 · local browser dashboard
Mission trend

Telemetry snapshot

Power and data

ADCS and communications

Use the Overview time slider to inspect the same sampled mission instant across all state fields.
Operations timeline
Alarm console
#TimeSeveritySubsystemCodeMessageRecommended action

Pass scheduler

Priorities combine onboard storage, pass geometry, power state, and actual simulation outcome.

PassUTCStationPriorityMax elevationMax rateStorage beforePlanned actionActual

Planning-only command console









Command plan

IDUTC / elapsedStationCommandSourceStatusRationale